f you're organising kit for a cycling club, running group or triathlon team, the biggest challenge isn’t design — it’s choosing the right apparel mix, fit and quantities.
This guide breaks down:
What clubs actually order in 2026
Real-world athlete preferences
Common (and costly) mistakes
How to get your kit right the first time
Based on event participation and club ordering trends:
👉 Insight: Most clubs underestimate how strongly performance trends influence apparel choices.
1–2 jerseys per rider
Bib shorts (core item)
Optional:
vests
arm warmers
winter jackets
Primary: singlets
Secondary:
t-shirts (social runs / events)
lightweight caps
1–2 tri suits per athlete
Training apparel often added:
cycling kit
run gear
👉 Most successful clubs keep it simple + scalable
Data based on internal customer orders and industry trends across Australia (2024-2026).
Typical ranges (per athlete):
Cycling kit: $120–$250
Running kit: $40–$90
Tri suits: $150–$350
Factors that impact pricing:
Order volume
Garment type (entry vs premium)
Fabric selection
Customisation complexity
Reorders vs first run
👉 Insight: Most Clubs spend between $3,000-$15,000 per order depending on size and kit type.
Choosing race fit for casual riders
Over complicating designs
Ordering too many sizes (or not enough core sizes)
Ignoring climate (summer vs winter kits)
Not planning reorders
Prioritising price over comfort
Rushing production timelines
👉 These mistakes lead to wasted budget + unused stock
Step 1: Define your riders/athletes
Competitive vs social
Step 2: Choose core kit
Cycling → bib + jersey
Running → singlet
Tri → tri suit
Step 3: Add optional layers
Weather-based
Step 4: Plan quantities + reorders
👉 The best kits are simple, wearable, and repeatable
Typical turnaround:
Design: 1–2 weeks
Production: 4–6 weeks
Delivery: Australia-wide
👉 Plan for 6–8 weeks total
Request a quotation
Submit your design brief
Receive design mock-ups
Approve artwork
Production begins
Delivery to your team or event
Most suppliers now offer low minimum orders and streamlined ordering systems.
Singlets are the most common choice, especially for events and racing.
Typically 4–6 weeks production after design approval.
Sleeved tri suits are now the most popular for performance.
Most clubs start with core items and expand over time.




























👉 If you run a club or event, get in touch to be featured here.
Fast turnaround
Premium materials
Designed for performance